Renovation · Gistel

Townhouse renovation in Gistel.

Structural work and a new floor structure for the next chapter of a characterful townhouse.

Rear facade of the townhouse in Gistel after the structural work, with the H&D Andries van.
Rear facade of the townhouse in Gistel after the structural work, with the H&D Andries van.

Renovating a townhouse means looking carefully at both its existing structure and its future possibilities. In Gistel, H&D Andries carried out extensive demolition and structural work as a basis for the further renovation. From the ground below to the load-bearing structure, we made room step by step for a new layout and a greater sense of space.

01 / The works

Making room for renewal.

We demolished the existing rear extension, sorted the resulting waste and removed it from the site. Underground masonry and concrete masses were also removed. We then backfilled and levelled the outdoor area.

Inside, we removed the existing building services and stripped out the floor structure above the crawl space and basement. We also carried out chimney demolition work, together with the necessary supporting masonry and the securing of the timber joists beneath the chimneys.

Demolition of the existing rear extension at the townhouse in Gistel.
Demolition of the existing rear extension at the townhouse in Gistel.
Removal of underground masonry and concrete masses behind the townhouse.
Removal of underground masonry and concrete masses behind the townhouse.
02 / The works

A new base beneath the home.

We installed new drainage pipes and basement ventilation pipes for the renewed layout. The crawl space was filled with sand and prepared for concreting.

Above the basement, we installed Staltolight floor elements. The floor structure was chemically anchored into the existing masonry. We then cast the new floor slab in concrete reinforced with Dramix steel fibres.

New drainage pipes beneath the future floor structure.
New drainage pipes beneath the future floor structure.
Careful levelling of the sand fill in preparation for the new floor slab.
Careful levelling of the sand fill in preparation for the new floor slab.
Staltolight floor elements and reinforcement above the basement before concreting.
Staltolight floor elements and reinforcement above the basement before concreting.
03 / The works

Connecting the kitchen and living room.

Temporary propping supported the existing structure during the work. A new steel beam between the kitchen and living room enabled a wider connection between the two spaces. We also installed a steel beam in the rear facade to create a larger opening and a greater sense of space.

These works provided the structural basis for the next chapter of this townhouse, with a renewed floor structure and a more connected living area.

Installed steel beam with temporary support between the living spaces.
Installed steel beam with temporary support between the living spaces.
New concrete floor in the townhouse, ready for the next renovation stages.
New concrete floor in the townhouse, ready for the next renovation stages.
← Back to all projects
Planning a renovation?

Making room for your plans.

Discuss your renovation

Tell us about your home and the work you have in mind.

Call usEmail usYour project ↗